028 542 53071
  • About us
    • Introduction
    • Human Resources
    • Quality Policy & Occupational Safety
    • Documents
  • SERVICES
    • Legal Advice
    • Design Consultancy
    • Monitoring Consulting & Project Management
    • Constructions
  • Projects
    • Civil & Industrial Works
    • Steel Structure
  • Media
    • News
    • Events
  • Contact
  • English
    • Tiếng Việt
    • English
    • 中文
  • Tiếng Việt
  • English
  • 中文

Constructions

  1. Home
  2. Constructions
Introduction to Construction Brochure Construction Items Construction Procedure Advantages

Introduction to Construction

To complete a construction project, an effective plan is needed. All related to the architectural design and construction of infrastructure works must be associated with the impacts caused to the natural environment caused by that project, must ensure that the construction works according to the program and budget. policies, construction safety at the construction site, impacts on people around the construction site, impacts due to construction delays.

For that reason, Chi Thanh always operates according to the construction process in a meticulous manner, ensuring strict commitments in the process of supervision - construction. We have a team of senior experts in finishing who always ensure the quality control process to ensure high technical and artistic quality in every item.

During the construction process, Chi Thanh will ensure the accuracy and uniformity from the design as well as the project acceptance regulations. correctly implemented in terms of construction time and handover to ensure correct and even exceed the construction schedule as originally set out.

WE PARTICIPATE IN PROJECTS IN THE FIELDS:

TRANSPORT AND IRRIGATION WORKS
ENERGY WORKS
INDUSTRIAL BUILDINGS
CIVIL WORKS

Brochure

To better understand the solutions in the field of activity as well as the capabilities and service commitments of Chi Thanh, please see our Capability Profile

Refer

Construction Items

INFRASTRUCTURE CONSTRUCTION
INFRASTRUCTURE CONSTRUCTION
ROUGH CONSTRUCTION
ROUGH CONSTRUCTION
FINISHING CONSTRUCTION
FINISHING CONSTRUCTION
ELECTRICAL SYSTEM (M&E)
ELECTRICAL SYSTEM (M&E)
CONSTRUCTION OF FIRE PROTECTION SYSTEM
CONSTRUCTION OF FIRE PROTECTION SYSTEM
WATER  SYSTEMS
WATER SYSTEMS
AIR CONDITIONING & VENTILATION SYSTEMS
AIR CONDITIONING & VENTILATION SYSTEMS

Construction Procedure

Testing and handover

General cleaning before handing over to the investor, conducting acceptance test and handover of completed works, warranty, maintenance, ...

Complete construction of infrastructure

Construction of urban transport systems, domestic water supply, rainwater drainage, wastewater drainage, waste treatment, power supply, communication lines,...

Construction of electromechanical systems (MEP)

Construction of power station system, refrigeration system, ventilation system, fire protection system, water supply, and drainage system

Roughness construction

Construction of columns, beams, floors, walls, walls, formwork work, concrete work, cleaning, waterproofing, erection of steel structures,...

Basement tunnel construction - underground items

Construction of pressing piles, diaphragm walls, bored piles, kingpost, digging pits, foundation construction, bracing systems, tunnels, underground...

Prepare surface

Leveling, dismantling, arranging temporary roads, headquarters office, worker camps, material gathering area, equipment, processing, sanitation area, tower crane,...

Advantages

PROFESSIONAL CONSTRUCTION, SAFETY
HIGH QUALITY PRODUCTS STANDARDS
GUARANTEE THE PROGRESS OF CONTINUOUS WORKS
DELICIOUS AFTER-SALE SERVICES
Consult now
REPUTATION - QUALITY - EFFICIENCY

31 Street 16, Vinh Loc Residential Area, Binh Hung Hoa B Ward, Binh Tan District, Ho Chi Minh City

Tax code: 0304973000
Contact
028 542 53071
xaydung@chithanh.vn
Quick Links
  • dainghiasteel.com
  • dainghiasteel.vn
© Designed & Developed by TEDFAST.